Case 03 – Arial Rigging and Lifting – Re-energy powerplant

For a client request,  just before the handover of a new energy plant, changing some structures of the central controll room. The work was to change a structure with arial-rigging manouvres inside the building. Special hoists where used inside this rigging plan, with a precision of a single mm the new frames and windows where installed inside the building.